PNOP is an important topic for the upcoming IPO Exam and PSS Gr B Exam as special impetus has been laid on PNOP off-late by the Directorate. Let’s know in detail about this topic. PNOP full form is Parcel Network Optimisation Project.
What is PNOP India Post? What is its objective?
PNOP means Parcel Network Optimisation Project. The PNOP was undertaken by the Department of Posts to streamline parcel operations to make them predictable, reliable, and efficient by standardization in the processes across the country so that all parcel sorting centers function in the same manner as consistency in operations ensures better monitoring and reporting. So, this prestigious project namely PNOP started on 17-08-2018.
Watch this Video fully RIGHT NOW to understand the PNOP Concept EASILY and EFFORTLESSLY. MCQs on PNOP included:
You may like to know simultaneously about MNOP and PNOP.
Click here to Read also on: MNOP and PNOP.
Enjoy the new Quiz on PNOP now?
You can restart several times until you are comfortable with the subject.
PNOP MCQs with PNOP Quiz
PNOP IndiaPost- CONCEPT
1.A new and separate network consisting of 190 Parcel Hubs, including 57 Level 1 (L1) and 133 Level 2 (L2) hubs for the handling parcels has been approved.
2. L1 Parcel Hub will close bags to all other L1 Parcel Hubs(PHs) in India, (ii) for L2 PHs within the Circle, & (iii) Delivery Post offices/Nodal Delivery Centres(NDCs) mapped with the L1 PH.
3. (i) Post offices have to prepare 2 separate TD and NTD Bags. Post offices and Booking Offices will prepare SP Document TD Bag, SP Parcel TD Bag, SP Document NTD Bag, SP Parcel NTD Bag.
(ii) National Sorting Hubs(NSHs) have to close SP Documents and SP Parcel Bags for other NSHs and Intra Circle Hubs (ICHs)
(iii) ICHs have to close SP Documents and SP Parcel Bags for other NSHs and Intra Circle Hubs (ICHs)
4. Delivery Norms for Nodal Delivery Centres are:
(i) Metros where Parcel density exceeds 2 parcels per sq km
(ii) All other cities/towns where Parcel exceeds 1 parcel per sq km
5. Speed Post articles will qualify for as a parcel provided any one of the following conditions are met:
(i) The weight of the SPeed Post article is beyond 500 grams.
(ii) The Dimensions of Speed Post article is beyond 38cms X27 cms X 2 cms.
(iii) The Customer declares the contents of the Speed Post article as merchandise.
What is PNOP Dashboard?
PNOP Dashboard is a dashboard set up by CEPT, Mysore for better monitoring of the PNOP project activities by the Parcel Directorate. Monitoring the Civil works, procurement of standardized equipment, operationalization of Parcel Hubs, Nodal Delivery Centres (NDC) is the very purpose of the PNOP Dashboard. The Dashboard is updated by the Circles regularly on day to day basis, and the Directorate monitors it.
The link to that PNOP Dashboard is shared for your convenience:
PNOP DASHBOARD
The said PNOP project Dashboard for PNOP IndiaPost works in Sify as well as broadband by using user ID and password shared to the Circles/Regions.
Further, PNOP Dashboard has the option to update RTN (Road Transport Network) movements. The Directorate will be monitoring the stage-wise movements of RTNs, whether they are adhering to the time, schedule, etc.
PNOP MCQs for IPO Exam & PSS Gr B Exam has been given below for your convenience.
Adhoc Norms on PNOP IndiaPost
You are provided with Adhoc norms on PNOP right below. You can see a sequence of numbers in ascending order to enable you to remember them easily(starts with 1 and ends with 1200):
SLNO |
Under the PNOP concept, Adhoc Norms for |
Adhoc Norms |
1. | Bagging | 1 minute per bag |
2. | (i) Parcel Bag Dispatch scan;
(ii) Parcel bag facility in-scan |
4 Bags per minute |
3. | (i) Parcel SWS Weighment;
(ii) Parcel exception scan |
6 parcels per minute |
4. |
Booking Parcels |
48 parcels per hour |
5. |
Sorting & bagging at a mixed station |
150 parcels per hour |
6. | (i) when Parcel bag opening, parcel receipt scan & primary sorting activity is done at the bag opening table
(ii) Bag opening, parcel scanning, and sector sorting (iii) Secondary sorting of parcels & bagging |
250 parcels per hour |
7. |
Parcel bag opening as per PNOP concept when only bag opening & parcel receipt scan activity is done at the bag opening table |
350 parcels per hour |
8. |
Sorting of bags for post-sort staging |
360 Bags per hour |
9. | Primary sorting of parcels | 700 parcels per hour |
10. | Parcel facility in-scan | 720 parcels per hour |
11. | Parcel feeding on an automated sorter | 1200 parcels per hour |
Required Operational area for a Parcel Hub as per PNOP India Post
(1)Very-Small Category Parcel Hub:
A Parcel Hub with an operational area of 500 Sq ft where parcels processed in a Parcel Hub in a shift/set are up to 500 is called the Very-Small Category Parcel Hub.
(2) Small Category Parcel Hub:
A Parcel Hub with an operational area of 1500 Sq ft where parcels processed in a Parcel Hub in a shift/set are between 500 to 1500 is called the Small Category Parcel Hub.
(3) Medium Category Parcel Hub:
A Parcel Hub with an operational area of 3000 Sq ft where parcels processed in a Parcel Hub in a shift/set are between 1500 to 3000 is called the Small Category Parcel Hub.
(4) Large Category Parcel Hub:
A Parcel Hub with an operational area of 8456 Sq ft where parcels processed in a Parcel Hub in a shift/set are between 3,000 to 8,400 is called the Small Category Parcel Hub.
PNOP MCQs for IPO Exam & Gr B Exam-PNOP in India Post
1. What is the Adhoc norm for bagging as per the PNOP concept is:
(A) 60 seconds per bag (B) 30 seconds per bag
(C) 45 seconds per bag (D) 90 seconds per bag
2. What is the Adhoc norm for parcel bag dispatch scan as per the PNOP concept is:
(A) 8 bags per minute (B) 2 bags per minute
(C) 6 bags per minute (D) 4 bags per minute
3. What is the Adhoc norm for booking parcels as per the PNOP concept is:
(A) 72 parcels per hour (B) 24 parcels per hour
(C) 36 parcels per hour (D) 48 parcels per hour
4. What are the Adhoc norms for parcel facility in-scan as per PNOP concept is:
(A) 720 parcels per hour (B) 240 parcels per hour
(C) 360 parcels per hour (D) 480 parcels per hour
5. What is the Adhoc norm for parcel bag facility in-scan as per PNOP concept is:
(A) 4 bags per minute (B) 5 bags per minute
(C) 6bags per minute (D) 10 bags per minute
6. What is the Adhoc norm for parcel bag opening, as per the PNOP concept, when only bag opening & parcel receipt scan (hub sorter receipt scan) activity is done at the bag opening table is:
(A) 125 parcels per hour (B) 375 parcels per hour
(C) 350 parcels per hour (D) 200 parcels per hour
7. What is the Adhoc norm for parcel bag opening, as per PNOP concept, when bag opening & parcel receipt scan (hub sorter receipt scan) & primary sorting activity is done at the bag opening table is:
(A) 125 parcels per hour (B) 375 parcels per hour
(C) 250 parcels per hour (D) 200 parcels per hour
8. What is the Adhoc norm for parcel SWS Weighment as per the PNOP concept is:
(A) 6 parcels per minute (B) 8 parcels per minute
(C) 10 parcels per minute (D) 4 parcels per minute
9. What is the Adhoc norm for primary sorting of parcels as per the PNOP concept is:
(A) 100 parcels per hour (B) 600 parcels per hour
(C) 700 parcels per hour (D) 500 parcels per hour
10. What is the Adhoc norm for secondary sorting of parcels & bagging as per the PNOP concept is:
(A) 200 parcels per hour (B) 350 parcels per hour
(C) 450 parcels per hour (D) 250 parcels per hour
11. What is the Adhoc norm for sorting bags for post-sort staging as per the PNOP concept is:
(A) 250 bags per hour (B) 360 bags per hour
(C) 480 bags per hour (D) 500 bags per hour
12. What is the Adhoc norm for sorting & bagging at a mixed station as per the PNOP concept is:
(A) 100 parcels per hour (B) 125 parcels per hour
(C) 150 parcels per hour (D) 250 parcels per hour
13. What is the Adhoc norm for parcel automated sorter as per the PNOP concept is:
(A) 1400 parcels per hour (B) 1000 parcels per hour
(C) 1200 parcels per hour (D) 800 parcels per hour
14. What are the Adhoc norms for bag opening, parcel scanning, and sector sorting as per the PNOP concept ?:
(A) 250 parcels per hour (B) 300 parcels per hour
© 500 parcels per hour (D) 400 parcels per hour
15. What is the Adhoc norm for parcel bag facility in-scan as per PNOP concept is:
(A) 4 bags per minute (B) 8 bags per minute
(C) 6 bags per minute (D) 12 bags per minute
16. What is the Adhoc norm for Parcel exception scan as per the PNOP concept is:
(A) 4 parcels per minute (B) 8 parcels per minute
(C) 10 parcels per minute (D) 6 parcels per minute
17. As per PNOP guidelines, what is the concept to be followed for filling the delivery bag or delivery vehicle:
(A) FIFO (B) LIFO (C) FILO (D) LILO
18. As per PNOP guidelines, the number of failed delivery attempts (due to recipient caused reasons or receipt has refused to accept the parcel) that qualify for return of a parcel are:
(A) 1 attempt (B) 2 attempts (C) 3 attempts (D) 4 attempts
19. As per the PNOP concept, Large parcels for delivery are those parcels which are weighing (physical & volumetric) above:
(A) 1 Kg (B) 2 Kg (C) 5 Kg (D) 10 Kg
20. Sorting happens in High volume delivery offices receiving a large number of parcels for daily delivery in:
(A) 2 stages namely preliminary sorting into sectors and detailed sorting into respective beats
(B) 1 stage with detailed sorting into respective beats
(C ) 2 stages namely primary sorting into beats and secondary sorting into respective sectors
(D) 1 stage with detailed sorting into respective sectors
PNOP Project Equipment
21. What is the PTL algorithm in a DWS machine?
(A) Put to Light (B) Pause to Light (C) Path to Load (D) Pace to Load
22. What is SWS as per the PNOP concept?
(A) Standard Weighment system (B) Static Weighment system
(C) Security Warning system (D) Safety Warning system
23. As per the PNOP concept, what does Facility refers to:
(A) Facilities already available in a Parcel Hub
(B)Facilities to be made available in a Parcel Hub
(C) The area outside the Parcel Hub
(D) Physical Location where Parcel Hub or NDC is located
24. What is FIFO in the PNOP concept?
(A) Fly in Fly Out (B) First in First out
(C) First in Far-out (D) Fast in Fast out
25. As per the PNOP concept, DWS stands for:
(A) Dimension, weighing & scanning (B) Data web services
(C) Data Warehouse software (D) Design work-study
26. As per the PNOP concept, closed bags from the post-sort staging area to the dispatch area are brought by:
(A) dragging the bags on the floor (B) Package trolley
(B) Bag Stand (D) Roller Container
27. Which of the following only needs to be used for cutting the bag seals in a Parcel Hub as per PNOP guidelines:
(A) End Mill cutter (B) Parrot Beak cutter
(C) Dovetail cutter (D) woodruff cutter
28. As per the PNOP concept, primary sorting is done in
(A) Package trolley (B) Roller container
(C) Pigeonholes (D) Bag stands
29. As per the PNOP concept, direct sorting is done in
(A) Package trolley (B) Roller container
(C) Pigeonholes (D) Bag stands
30. As per the PNOP concept, secondary sorting is done in
(A) Package trolley (B) Roller container
(C) Pigeonholes (D) Bag stands
31. As per the PNOP concept, FIFO is to be maintained in:
(A) Feeding bags to bag opening/primary sort station (B) Filling the delivery Bag
(C) Filling the delivery vehicle (D) None of the above
32. Which of the following is correct according to per PNOP concept:
(A) Parcels should be kept on the ground
(B) Parcel Bags should be kept on the ground
(C) Parcel Label is to be pasted on the bottom of the parcel facing downwards
(D) Forward bags to be directly taken to the post-staging area and sorted as per the dispatch plan.
33. As per the PNOP concept, a parcel requiring volumetric weight is weighed on a:
(A) SWS (B) BWS (C) CWC (D) LWS
34. A parcel in which the destination pin code in the system & on the parcel is the same but has reached the wrong office, then the parcel is a:
(A) Mis-sorted parcel (B) Mis-routed parcel (C) Tossed parcel (D) None of the above
35. A parcel that is sent to an incorrect office due to customers mentioning incorrect pin code or address or the booking personnel entering the wrong pin code in the system is called:
(A) Mis-sorted parcel (B) Mis-routed parcel (C) Tossed parcel (D) None of the above
36. A bag is said to be missorted if:
(A) the destination on the bag label is correct and the location where the bag is received is different from the one mentioned on the bag label.
(B) the destination on the bag label itself is incorrect due to which the bag is received at a destination at which the parcels contained within the bag were not supposed to be received.
(C) A & B
(D) None of the above.
37. Every bag has to be examined on its receipt in terms of rule
(A) Rule 140 of Postal Manual Vol VIII
(B) Rule 138 of Postal Manual Vol V
(C) Rule 142 of Postal Manual Vol IV
(D) Rule 138 of Postal Manual Vol VI
Presumptive Loss under PNOP Project Concept
38. The presumptive loss needs to be recovered from the official at fault if the bag/parcel is not traced within:
(A) 2 days (B) 5 days (C) 7 days (D) 10 days
39. If an inward error is not resolved, the Record officer (in RMS) will have to notify the in charge of the set against which error report has been, made within:
(A) 2 days from the date of receipt of the error
(B) 3 days from the date of receipt of the error
(C) 5 days from the date of receipt of the error
(D) 10 days from the date of receipt of the error
40. The process for presumptive loss (if already not recovered) will be initiated by the HRO/SRO if the in-charge/MA (in RMS) of the defaulting set fails to give a satisfactory reply within:
(A) 2 days (B) 3 days (C) 5 days (D) 7 days
41. The process for presumptive loss (if already not recovered) will be initiated by the Office In-charge in a Post office if the error is not resolved:
(A) 2 days (B) 3 days (C) 5 days (D) 7 days
42. As per the PNOP concept, the amount of presumptive loss will be calculated based on:
(A) The amount of maximum compensation which Department may have to pay to the customer for that parcel in case of loss or abstraction of a parcel.
(B) The amount of maximum compensation which Department may have to pay to the customer for all parcels which are invoiced in the bag in case of loss of a parcel bag.
(C) A & B
(D) None of the above
43. Which of the following is incorrect about Presumptive loss:
(A) If the amount of presumptive loss is voluntarily deposited by the erring official or group of officials, the officer-in-charge will deposit the amount in the appropriate head of accounts
(B) If any parcel or bag for which amount of presumptive loss has already been deposited by the erring officials is subsequently traced, the amount deposited will be returned.
(C) Voluntary deposit of presumptive loss or its return due on tracing of the parcel/bag at a subsequent date does not preclude any other action which department may initiate against erring official for the acts of commission or omission.
(D) Voluntary deposit of presumptive loss or its return due on tracing of the parcel/bag at a subsequent date will not entail any other action which department may initiate against erring official for the acts of commission or omission.
44. Who maintains the Register of for monitoring recovery of the presumptive loss suffered by the Department?
(A) Record office (B) Post office
(C) PO/RMS Divisional office (D) All the above offices
45. The number of days from the day of a discrepancy, within which recovery of the presumptive loss of a parcel/parcel bag from the identified erring officials to be made is:
(A) 45 Days (B) 30 days (C) 15 Days (D) 60 days
46. In respect of serious errors received /issued and instances of non-tallying of abstracts, Post office Incharge has to send a report on the last day of every :
(A) Week (B) fortnight (C) Month (D) Quarter
47. The numbering of errors in the inward/outward register will be done in consecutive series as per
(A) Financial year basis (B) Academic year basis
(C) Calendar year basis (D) None of the above
Abstracts Tallying/Forms maintained in PNOP Concept
48. As per the PNOP concept, Forms maintained by Parcel Hub are:
(A) 1F, 2A to 2 D (B) 2A to 2 D only (C) 1A to 3 F (D) 3 A to 3 F
49. As per the PNOP concept, Forms maintained by the Divisional office are:
(A) 1F, 2A to 2 D (B) 2A to 2 D only (C) 1A to 3 F (D) 3E & 3F
50. As per the PNOP concept, Forms maintained by the Record office are:
(A) 1F, 2A to 2 D (B) 3A to 3 D (C) 1A to 3 F (D) 3E & 3F
51. As per the PNOP concept, Forms maintained by Mail agency/TMO are:
(A) 1A to 1 E (B) 1 A to 1 F (C) 1A to 3 F (D) 3E & 3F
52. As per the PNOP concept, Forms maintained by Post office/NDC are:
(A) 1A to 1 E & 2A ,2 B, & 2 D
(B) 1 A to 1 F & 2 A to 2 D
(C) 1A to 3 F
(D) 3E & 3F
53. As per the PNOP concept, Forms maintained by the Post office only are:
(A) 1A to 1 E & 2A ,2 B, & 2 D
(B) 1 A to 1 F & 2 A to 2 D
(C) 1A to 3 F
(D) 3A to 3 F.
54. The two forms that are ONLY prepared by Parcel Hubs are:
(A) 1F & 2C (B) 1A & 2C (C) 1D & 3D (D) 1D & 3E
55. What is the handling capacity of a Roller container as per the PNOP concept?
(A) up to 15 closed parcel bags (B) up to 20 closed parcel bags
(C ) up to 30 closed parcel bags (D) up to 40 closed parcel bags
56. What is the handling capacity of a Package Trolley as per the PNOP concept?
(A)Can hold up to 50 parcels
(B) Can hold up to 15 parcels
(C) Can hold up to 30 parcels
(D) Can hold up to 40 parcels
57. Which of the following are standardized equipment as per the PNOP concept:
(A) Bag stand with 6 bag holding positions
(B) Bag stand with 8 bag holding positions
(C) Bag stand with 10 bag holding positions
(D) A, B & C
58. Which of the following are standardized equipment as per the PNOP concept:
(A) Sorting case with 9 bag holding positions
(B) Sorting case with 12 bag holding positions
(C) Sorting case with 15 bag holding positions
(D) A; B & C
59. The dimensions of the computer stand as per the PNOP concept are:
(A) 2ft X 2 ft (B) 3ft X 3 ft (C) 4ft X 4 ft (D) 5ft X 5 ft
60. The dimensions of the SWS/IP enabled weighing scale as per the PNOP concept are:
(A) 2ft X 2 ft (B) 3ft X 3 ft (C) 4ft X 4 ft (D) 5ft X 5 ft
61. The maximum number of parcels that would need to be processed per hour by the sorting facility is called:
(A) Latency (B) Output (C) Response time (D) Throughput
Nodal Delivery Centre (NDC)
62. As per the PNOP concept, an area, where COD amount reconciliation is undertaken in an NDC, is:
(A) Secure Parcel storage area (B) Data Admin Area
(C) Staging Area (D) Beat sorting area
63. Which of the following is NOT regarded as an operational area in an NDC as per the PNOP concept:
(A) Data Admin Area (B) Stationery Area
(C) Server Room (D) Secure Parcel storage area
64. Dimensions of a sequencing table in an NDC as per the PNOP concept are:
(A) 4ft x 2 ft (B) 8ft x 4 ft (C) 6ft x 2 ft (D) 5ft x 3 ft
65. Which of the following is key operational equipment of NDC as per the PNOP concept?
(A) Sequencing Table (B) Angle racks (C) A & B (D) SWS
66. Angle rack in an NDC has to be designed to hold undelivered parcels, in the facility until they are initiated for return, up to:
(A) 3 days (B) 5 days (C) 7 days (D) 10 days
67. The receipt and dispatch area of NDC should have an entrance /opening for docks of the facility with at least:
(A) 6 feet wide (B) 8 feet wide (C) 10 feet wide (D) 5 feet wide
Floor Markings under PNOP concept
68. The color used to mark different processing areas in the facility as a part of the floor marking color scheme in NDCs is:
(A) Green (B) Yellow (C) Blue (D) Red
69. The color used to mark equipment and work stations position/placement in the facility as a part of floor marking color scheme in NDCs is:
(A) Green (B) Yellow (C) Blue (D) Red
70. The color used to mark aisles in the facility as a part of the floor marking color scheme in NDCs is:
(A) Green (B) Yellow (C) Blue (D) Red
71. The color used to mark equipment movement pathways in the facility as a part of the floor marking color scheme in NDCs is:
(A) Green (B) Blue (C) Yellow (D) Red
72. Which of the following equipment is used for segregating based on product type, TD/NTD deliveries to support sort prioritization:
(A) Package trolley (B) SWS (C) Bag Stand (D) Roller container
73.Loose parcels received from bulk customers in a Parcel Hub are unloaded directly into the:
(A) Package trolleys (B) Roller containers (C) Bag stands (D) Pigeon holes
74. The equipment used in NDCs for beat sorting and sequencing as per beat route to be undertaken by the delivery agent/ postman is:
(A) Sorting case (B)Angle rack (C) SWS (D) Sequencing table
75. The equipment that is used for secured storage of undelivered parcels that need delivery reattempt or storage for receipt pick-up from the delivery center in NDCs is:
(A) SWS (B) Angle Racks (C) Sequence Table (D) Package trolley
76. The equipment that can capture physical weight, as well as the dimensional weight of a package in NDCs, is:
(A) Angle Rack (B) Package trolley (C) SWS (D) Sequence table
77. Specification of minimum weighting capacity for SWS in an NDC is:
(A) 20kg (B) 30 Kg (C) 35 Kg (D) 50 Kg
More on Nodal Delivery Centre under PNOP concept
78. As per the NDC concept, Four-wheelers would be used to deliver bigger parcels typically more than:
(A) 1 kg (B) 2 kg (C) 3 kg (D) 5 kg
79. As per the NDC concept, four-wheelers would be used to deliver bigger parcels about the range of:
(A) 80-90 parcels per four-wheeler (B) 70-80 parcels
(C) 100 parcels (D) 120-150 parcels
80. As per the NDC concept, on a two-wheeler, a postman would be capable of delivering about:
(A) 60 parcels in 2 rounds (B) 60 parcels in 1 round
(C) 70 parcels in 2 rounds (D) 80 parcels in 3 rounds
81. NDCs are to be set up in all metros and such other town/cities where parcel density exceeds:
(A) 2 parcels/sq km (B) 4 parcels/sq km
(C) 3 parcels/sq km (D) 1 parcel/sq km
82. Parcel sorting facility includes:
(A ) Parcel Hubs (B) Nodal Delivery Centres (C) A & B (D) Post offices
83. Semi-automated parcel Hub facility may NOT have:
(A ) Arm sorter (B) Cross-belt sorter (C) Tilt sorter (D) PTL
84. What is the prescribed specification of carrying capacity for a postman delivery bag in NDCs under PNOP?
(A) 30 kg or better (B) 25 kg or better (C) 20 kg or better (D) 50 kg or better
85. As per the PNOP concept, the Minimum dimensions of receipt & dispatch area for NDC are:
(A) 8 ft X 6ft (B) 10 ft x 6 ft (C) 8 ft X 5 ft (D) 10 ft X 10 ft
Answers to MCQs:
1(A) | 2(D) | 3(D) | 4(A) | 5(A) | 6(C) | 7(C) | 8(A) | 9(C) | 10(D) |
11(B) | 12(C) | 13(C) |
14(A) |
15(A) | 16(D) | 17(B) | 18(B) | 19(B) | 20(A) |
21(A) | 22(B) | 23(D) | 24(B) | 25(A) | 26(D) | 27(B) | 28(A) | 29(D) | 30(C) |
31(A) | 32(D) | 33(A) | 34(A) | 35(B) | 36(C) | 37(B) | 38(B) | 39(A) | 40(B) |
41(C) | 42(C) | 43(D) | 44(D) |
45(A) |
46(A) | 47(C) | 48(A) | 49(D) | 50(B) |
51(A) | 52(A) | 53(D) | 54(A) | 55(B) | 56(A) | 57(D) | 58(D) | 59(A) | 60(B) |
61(D) | 62(B) | 63(C) | 64(C) | 65(C) | 66(C) | 67(B) | 68(C) | 69(A) | 70(B) |
71(C) | 72(D) | 73(A) | 74(D) | 75(B) | 76(C) | 77(C) | 78(B) | 79(B) | 80(A) |
81(D) | 82(C) | 83(D) | 84(A) | 85(A) |
Now it’s your turn.
Hope you liked this post.
Which question did you like the most?
Did you like the Quiz section? Do you want more of the Quiz section in the ensuing posts, let me know in the comments section below right now by commenting ”YES” ?
Read More:
Miscellaneous Rules for IPO Exam & Gr B Exam
Leave Rules for IPO Exam & Gr B Exam
LTC Rules for IPO Exam & Gr B Exam;
CEA & Hostel Subsidy MCQs for IPO Exam & Gr B Exam
PSS Group B Syllabus 2019 with study material & resources
IPO Exam Syllabus and Books & Reading material: 2020(Latest)
IPO Exam Question Paper 2019: IPO Exam 2019 Question Paper
Revised Syllabus PSS GroupB Examination(Latest 30-12-2019)
Post office acronyms & abbreviations
Study Material for Postman Exam pdf: 2020 Update
Parcel Directorate has released the following manuals for the convenience of users. Now, you can download it here for more information.
Download: Parcel Operations Manual
Download: Design Manual Parcel Hub and Nodal Delivery Centre
Respected Sir
Thank you very much for sharing valuable information and exam material
Regards
MSH Krishna
Thank you. Have a great day?
Hi sir,
Superb quiz. Kindly post more and more like this………
First attempt i got 40%
Second attempt i got 86%
This attempt i got 109%
Great Jeevan. Keep rocking.
Sir, 1st -29%, 2nd-93%
Great.
Please share material for CSI, CBS and IPPB For Group B Exam.
Ok. Let me try.
Hi sir this is very useful material. Thanks
Welcome, Umesh! Great that you found it useful. You may like the Quiz section also.
Check out those.RMFS(Remotely Managed Franking System): MCQs for IPO Exam & PS Gr B
BO Inspection Questionnaire MCQs & Quiz (for IPO Exam PS Gr B Exam)
Annual Administrative Report 2019-20 MCQs for IPO Exam & Gr B Exam
General Finance Rules (GFR) & Advances: MCQs IPO Exam & Gr B Exam
Respected sir
The info about PNOP is very useful and also covered every aspect,kindly share info regarding MNOP as well.
Thank you Pratyusha! Definitely, MNOP will be covered soon.
Sir very nice information to score in LDCE ip exam
Sir very nice information to score in LDCE ip exam
Sir very nice information to score higher marks in LDCE ip exam
Thank You, Guru prasad Ji